Copper Insert Mould for PP Disposable Transparent Thin-walled Box
You are here: Home » Mould » Thin Wall Mould » Copper Insert Mould for PP Disposable Transparent Thin-walled Box

Copper Insert Mould for PP Disposable Transparent Thin-walled Box

Share to:

Mold Steel:718.2344 or customized
Runner :Hot Runner
Injection Mould
Package:Wooden Package

  • JT-BB-2
  • Jingtu
  • 8480719090
Quantity:

Product Description

Mold name 
Thin Wall Plastic mould
Mold structure  Hot runner with vavle gate system(Germany HOTSET heaters)
Mold core/cavity material  S136, NAK80,Copper or as customer' s requirement
Mold base material  718, 2344,  or as customer' s requirement
Design software  PROE, Cimtron, UG, AutoCAD, CAM, CAE, UG, ect
Mould surface  Texture/Mirror Polish or according to customer' s request
Delievery time  30-40days after get the deposit

薄壁1


薄壁2

MOULD  MANUFACTURE  PROCESS

2

Business Steps
1. R& D    We support customers' R& D. We'll make the  files or improve the design if you need

2. Quotation Making  Mould Quotation will be finished in 1 day according to information we get.

3. Negotiation    The negotiation includes quality, price, material, delivery time, payment item, ect.

4. Mould Design   We need to spend 3-5 days on mould and product 3D/2D drawing design

5. Mould   We will build the mould based on customers' requirements. Before making the mould, we'll send mould design to get customers' approval first. Mould will be usually completed in 25-60 days

6. Mould Testing  When moulds are finished, we will test the moulds to check if they will satisfy consumers' needs. And we will send samples for consumers' reference.

7. Sample shoot   If the first sample come out is not satisfied by customers, we will modify the mould until it can meet customers' needs.

8. Delivery   We'll delivery goods either by sea or by air, according to customers' requirements.


薄壁盒镶铜模具 (1)薄壁盒镶铜模具 (2)薄壁盒镶铜模具 (3)薄壁盒镶铜模具 (4)

FAQ
Q: what is your trade term?
A: normally FOBNINGBO, if customer country requires, also can accept L/C at sight.
Q: what is your payment term?
A: 30% down payment against order confirmation, 70% balance payment prior shipment.
Q: Have blow machine 100% assemnled well in stock?
A: NO.All blow machine will be assembly produced according to your order.
Q:what is your delivery time?
A: usually in 10-45days, depends on your projects.
Q: what about installing in customer factory?
A: after machine arrive your factory, please prepare water, electric,air and perform, then we will arrange engineer to install machine and train your workers, the longest time to free installing shall be in one week, you should afford engineer air tickets, food, hotel,transport.
Q: what is your packing?
A: wooden pallet packing.
Q:guarantee time?
A: one year guarantee, not man-made.


样品间



WELCOME TO JINGTU MOULD

We offer not only products,but also our after-sales service.
View More >

QUICK LINK

CONTACT US

+86 15356572407
 +86 13216900876
  york@zgjtsm.com

FOLLOW US


SCAN WECHAT
Copyright ​©2019 Taizhou Huangyan Jingtu Plastic Mould Co.,Ltd.All rights reserved.

SEND MESSAGE